wyri,
@wyri@haxim.us avatar

Started working on the cable gutter for all the and () cables. Started with the patch panel on the left (home office) side.

Outside view of cables coming out heading towards the home office switch.

  • All
  • Subscribed
  • Moderated
  • Favorites
  • Ubiquiti
  • slotface
  • kavyap
  • thenastyranch
  • everett
  • tacticalgear
  • rosin
  • Durango
  • DreamBathrooms
  • mdbf
  • magazineikmin
  • InstantRegret
  • Youngstown
  • khanakhh
  • ethstaker
  • JUstTest
  • ngwrru68w68
  • cisconetworking
  • modclub
  • tester
  • osvaldo12
  • cubers
  • GTA5RPClips
  • normalnudes
  • Leos
  • provamag3
  • anitta
  • megavids
  • lostlight
  • All magazines