BruceHalperin,
@BruceHalperin@sfba.social avatar

@scott The section north of the Lefty O’Doul Bridge (which is two-way and street-level) is officially open to Townsend Street. This is the northbound section from Toni Stone to the south end of the bridge. It’s one way and sidewalk-level. The north end is blocked off because there’s still some construction, but you can go around it easily. The entrance to the lane is open at the southern end and there are no signs indicating that it’s not meant to be open yet.

  • All
  • Subscribed
  • Moderated
  • Favorites
  • SanFrancisco
  • DreamBathrooms
  • magazineikmin
  • tacticalgear
  • InstantRegret
  • ngwrru68w68
  • Durango
  • Youngstown
  • slotface
  • mdbf
  • rosin
  • PowerRangers
  • kavyap
  • thenastyranch
  • vwfavf
  • anitta
  • hgfsjryuu7
  • cisconetworking
  • osvaldo12
  • everett
  • ethstaker
  • GTA5RPClips
  • khanakhh
  • tester
  • modclub
  • cubers
  • Leos
  • normalnudes
  • provamag3
  • All magazines