jds, Dutch Day 3 of trail maintenance last week wrapped the water control by the new gabion net, then loads of tread work. Photos never show the magnitude of tread work but it was a lot of mudslide relocation (tons of dirt).
Tread work is my favorite, but it’s for sure the most back breaking. Takes a full week off from running to recover. Looks like a new project just posted for next week a little further up trail.
#TrailWork #TrailMaintenance #PacificCrestTrail #Volunteer #Stewardship
Piles of dirt to be moved from mudslides over the trail
Piles of dirt to be moved from mudslides over the trail
A portion of trail cleared from mudslides