jds, Dutch
@jds@sfba.social avatar

Day 3 of trail maintenance last week wrapped the water control by the new gabion net, then loads of tread work. Photos never show the magnitude of tread work but it was a lot of mudslide relocation (tons of dirt).

Tread work is my favorite, but it’s for sure the most back breaking. Takes a full week off from running to recover. Looks like a new project just posted for next week a little further up trail.

Piles of dirt to be moved from mudslides over the trail
Piles of dirt to be moved from mudslides over the trail
A portion of trail cleared from mudslides

  • All
  • Subscribed
  • Moderated
  • Favorites
  • PacificCrestTrail
  • kavyap
  • thenastyranch
  • GTA5RPClips
  • tester
  • InstantRegret
  • DreamBathrooms
  • ngwrru68w68
  • magazineikmin
  • everett
  • Youngstown
  • mdbf
  • slotface
  • rosin
  • cisconetworking
  • megavids
  • khanakhh
  • normalnudes
  • osvaldo12
  • cubers
  • tacticalgear
  • Durango
  • ethstaker
  • modclub
  • anitta
  • provamag3
  • Leos
  • JUstTest
  • lostlight
  • All magazines