@enobacon Traffic engineers don't stamp ALL of the plans. And often, a set of plans only has one stamp on the cover page from the design manager. Other times, each individual page is stamped by each individual discipline lead. So a traffic engineer would stamp the signal timing page and the intersection striping page. As a drainage engineer, I only stamped my hydraulic modeling reports. I did stamp a few utility relocation sheets on another project.