Becca needs to be able to add content to the TIA site without waiting for me to finish her flow.
So, being a pull-based human (preferring to wait until pulled enough to action) and perfectly willing to take on responsibility (friction) for my own stuff, I set to work.
The optimized (happy path) process looked like this: