hanse_mina, (edited ) to Finland
@hanse_mina@nafo.uk avatar

🧵 1/ The interconnection used for power transfer between and was disconnected suddenly on January 26th just after midnight local time.

An investigation regarding the disconnect has been launched. It's currently unknown why the disconnect happened and if there was an outside factor regarding it similar to the last year.

This was reported by , Finland's transmission system operator.

https://www.fingrid.fi/en/news/news/2024/failure-on-estlink-2-interconnection-26.1.2024/

henrihorn, to random
@henrihorn@mastodon.energy avatar

New CEO Asta Sihvonen-Punkka:
Today Finland has five 400kV lines between windy north and consumers in south. In 10 years it will be eleven.

  • All
  • Subscribed
  • Moderated
  • Favorites
  • normalnudes
  • tsrsr
  • DreamBathrooms
  • thenastyranch
  • magazineikmin
  • hgfsjryuu7
  • Youngstown
  • InstantRegret
  • slotface
  • everett
  • rosin
  • ngwrru68w68
  • kavyap
  • PowerRangers
  • Leos
  • ethstaker
  • GTA5RPClips
  • Durango
  • cisconetworking
  • osvaldo12
  • vwfavf
  • khanakhh
  • mdbf
  • cubers
  • modclub
  • tacticalgear
  • tester
  • anitta
  • All magazines