Check out the giant ship critical to building the world's biggest offshore wind farm

A project to build a facility described as “the world’s largest offshore wind farm” took a big step forward this month by producing its first power.

Located in the North Sea, over 130 kilometers off England’s northeast coast, the Dogger Bank Wind Farm still has some way to go before it’s fully operational, but the installation and powering up of its first turbine is a major feat in itself.

That’s because GE Vernova’s Haliade-X turbines stand 260 meters tall — that’s higher than San Francisco’s Golden Gate Bridge — and have blades measuring 107 meters.

Turbine installation at Dogger Bank has required a huge amount of planning and preparation, with the Voltaire — a specialist vessel designed and built by the family-owned Jan De Nul Group — playing a key role.

With a lifting capacity of 3,200 metric tons, the Voltaire — named after the 18th-century French philosopher — will have installed a total of 277 Haliade-X turbines when its work is complete.

  • All
  • Subscribed
  • Moderated
  • Favorites
  • news@lemmy.world
  • PowerRangers
  • everett
  • Youngstown
  • tacticalgear
  • slotface
  • rosin
  • Durango
  • hgfsjryuu7
  • kavyap
  • vwfavf
  • thenastyranch
  • DreamBathrooms
  • mdbf
  • magazineikmin
  • normalnudes
  • ethstaker
  • modclub
  • InstantRegret
  • osvaldo12
  • GTA5RPClips
  • ngwrru68w68
  • khanakhh
  • cubers
  • Leos
  • cisconetworking
  • tester
  • anitta
  • provamag3
  • All magazines