You999, 2 months ago If I had to speculate? Cost savings… The bridge already had a history of cost reductions such as originally being built with a shared approach way which vastly increased the risk of head on collisions. While the Key Bridge was built as a four-lane bridge, its approaches were kept to two lanes to save money
If I had to speculate? Cost savings… The bridge already had a history of cost reductions such as originally being built with a shared approach way which vastly increased the risk of head on collisions.
While the Key Bridge was built as a four-lane bridge, its approaches were kept to two lanes to save money