My concrete mixing and handling have a lot of room for improvement, I hear vibration tables help with this a lot. I also need to design a multi-piece mold so I can do more than one tile per 48 hours, and make some improvements to the tile shape like the fragile neck area. Overall though I’m really happy with this result!
Add comment